Stormwater Management Plan: DMV Guide (2026)

Stormwater Management Plan: DMV Guide (2026)

Koray Bozkurt, PE, PMP
Published on: 14/08/2026

A stormwater management plan controls runoff on DMV projects. In DC, sites disturbing 5,000 sq ft must retain the 1.2-inch storm. See the state rules.

stormwater management planSWM planDMV site planscivil engineeringDC DOEE stormwater

BOZ Engineering Group

From Feasibility to Final Permit.

Licensed in DC | Maryland | Virginia | Florida

  • Address: 7181 Lee Hwy, Falls Church, VA 22046, United States

  • Phone: +1 202-998-5445

Business hours

monday: 8am - 5pm

tuesday: 8am - 5pm

wednesday: 8am - 5pm

thursday: 8am - 5pm

friday: 8am - 5pm

7181 Lee Hwy, Falls Church, VA 22046, USA

Copyright 2026. BOZ Engineering Group. All rights reserved.